2024年4月13日发(作者:尉迟丝娜)
Acer 宏碁 4736ZG拆机图--拆修--显卡虚焊引起的开机掉
电
U: T4300主频: 2.1GHz显存容量: 512M硬盘容量: 250G内存容量: 2G光驱类
型: DVD刻
录笔记本显卡类型: 独立独立显卡型号: NVIDIA GeForce G 105M上市时间:
2009年笔记
本定位: 家庭影音
本本是以前同事的,最近频繁死机,频繁到最后开机掉电。询问购买至今未开
壳清灰过。
本本最近放在他店里灰尘很大。
机身左侧电源接口、网线接口、VGA、USB、HDMI、耳机麦克风等等。
Ellipticity of elbow pipes with diameters less than or equal to 150
mm must be not greater than 8% diameter of 200 mm or less shall not be
greater than 6%. Wall thickness of the pipe wall thinning rate must not
exceed the original 15%. Crease roughness: diameter 125 mm or less,
shall not exceed 3 mm diameter less than or equal to 200 mm, not more
than 4 mm. 7.3.9 simmering bending production of square steel tube
extension, to use the whole tube bending. Interface if necessary, the
welding position should be located in the middle of the vertical arm.
7.3.10 install expansion joints should be done. If design is not
required, pipe compensator lengthen should conform to the requirements
in the following table: square scale length δ x is equal to 1/2. Pre
stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location,
spacing shall meet the design and specifications. 7.3.12 piping on back
or return pipe at higher levels of the upper to automatic valve to
install a drain valve below the horizontal parts. 7.3.13 supports and
hangers of checks and the number 1) hanger installed must be checked
before installation of supports and hangers part models, specifications
of springs setting values, whether the materials meet the requirements
of drawings and documents; 2) supports and hangers of material, size and
accuracy shall conform to the provisions of the design drawings,
material technical requirements should be consistent with national
standards, industry standards and technical requirements related to the
alloy spectrum review should be carried out; 3) pipe supports and
hangers part plant product quality certificate for each variable spring
supports, constant support hangers, dampers, damper function, there
should be factory calibrated test
2024年4月13日发(作者:尉迟丝娜)
Acer 宏碁 4736ZG拆机图--拆修--显卡虚焊引起的开机掉
电
U: T4300主频: 2.1GHz显存容量: 512M硬盘容量: 250G内存容量: 2G光驱类
型: DVD刻
录笔记本显卡类型: 独立独立显卡型号: NVIDIA GeForce G 105M上市时间:
2009年笔记
本定位: 家庭影音
本本是以前同事的,最近频繁死机,频繁到最后开机掉电。询问购买至今未开
壳清灰过。
本本最近放在他店里灰尘很大。
机身左侧电源接口、网线接口、VGA、USB、HDMI、耳机麦克风等等。
Ellipticity of elbow pipes with diameters less than or equal to 150
mm must be not greater than 8% diameter of 200 mm or less shall not be
greater than 6%. Wall thickness of the pipe wall thinning rate must not
exceed the original 15%. Crease roughness: diameter 125 mm or less,
shall not exceed 3 mm diameter less than or equal to 200 mm, not more
than 4 mm. 7.3.9 simmering bending production of square steel tube
extension, to use the whole tube bending. Interface if necessary, the
welding position should be located in the middle of the vertical arm.
7.3.10 install expansion joints should be done. If design is not
required, pipe compensator lengthen should conform to the requirements
in the following table: square scale length δ x is equal to 1/2. Pre
stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location,
spacing shall meet the design and specifications. 7.3.12 piping on back
or return pipe at higher levels of the upper to automatic valve to
install a drain valve below the horizontal parts. 7.3.13 supports and
hangers of checks and the number 1) hanger installed must be checked
before installation of supports and hangers part models, specifications
of springs setting values, whether the materials meet the requirements
of drawings and documents; 2) supports and hangers of material, size and
accuracy shall conform to the provisions of the design drawings,
material technical requirements should be consistent with national
standards, industry standards and technical requirements related to the
alloy spectrum review should be carried out; 3) pipe supports and
hangers part plant product quality certificate for each variable spring
supports, constant support hangers, dampers, damper function, there
should be factory calibrated test