最新消息: USBMI致力于为网友们分享Windows、安卓、IOS等主流手机系统相关的资讯以及评测、同时提供相关教程、应用、软件下载等服务。

调试方案commissioning(中英文双语版)

IT圈 admin 28浏览 0评论

2024年5月11日发(作者:顾怡乐)

3.14 Single-machine commissioning, system commissioning and

joint commissioning

3.14 单机调试、系统调试、联动调试

3.14.1 Overall plan of commissioning

3.14.1 调试总体策划

Commissioning work is divided into three stages, which is shown in the figure

3.14.1-1.

调试工作分为三个阶段,见图3.14.1-1。

Figure 3.14.1-1 Commissioning work

图3.14.1-1 调试工作

Commissioning work of the project mainly includes implementation and

management of commissioning of HVAC works, commissioning of electrical works,

commissioning of plumbing as well as commissioning of fire fighting works.

本工程系调试工作主要包括通风空调工程调试、电气工程调试、给排水及消防工程调

试实施及管理工作。

1. Commissioning indispensable conditions are shown in the table 3.14.1-1.

1、调试具备条件见表3.14.1-1。

1 / 26

Table 3.14.1-1 Commissioning indispensable conditions

表3.14.1-1 调试具备条件

No.

序号

Name of

system

系统名称

Preparatory work before commissioning

调试前的准备工作

Installation of electrical equipment is completed. Laying of bridge, medium

& low voltage cables and busbar is completed; wiring of secondary control

cables is right as per drawings. Installation of power and lighting

Electrical

1 system

电气系统

switchboard is completed; installation and wiring of power equipment are

completed; appearance check is qualified. Wiring of various lamps is

completed. Wiring of various switch panels is completed.

电气设备安装完毕。桥架及中、低压电缆、母线敷设完毕,二次控制电缆按

图纸接线正确。动力、照明配电盘安装完毕,动力设备安装、接线完毕,外

观检查合格。各种灯具接线完成,各种开关面板接线完毕。

Stable power supply for air conditioning ventilating equipment, duct purging

is qualified. Stable power supply for air conditioning water system, system

2

HVAC system flushing is qualified; hydraulic pressure of the system meets requirements;

通风空调系统 valve is turned on and turned off normally.

空调风系统设备供电稳定,风管吹扫合格。空调水系统设备供电稳定,系统

冲洗合格;系统水压满足要求,阀门启闭正常。

System of

plumbing as

3

well as fire

fighting

给排水及

消防系统

Connection of equipment and pipeline is correct, it shall check

completeness before equipment operates, hydraulic pressure test of pipe

system and circulating flushing work of system have been completed.

设备和管道连接准确,设备运行前应进行完整性检查,管道系统水压试验与

系统循环清洗工作已经完毕。

2. Organization measures of commissioning

2、调试的组织措施

(1)Organization chart of commissioning is shown in the figure 3.14.1-2.

(1)调试的组织机构见图3.14.1-2。

2 / 26

2024年5月11日发(作者:顾怡乐)

3.14 Single-machine commissioning, system commissioning and

joint commissioning

3.14 单机调试、系统调试、联动调试

3.14.1 Overall plan of commissioning

3.14.1 调试总体策划

Commissioning work is divided into three stages, which is shown in the figure

3.14.1-1.

调试工作分为三个阶段,见图3.14.1-1。

Figure 3.14.1-1 Commissioning work

图3.14.1-1 调试工作

Commissioning work of the project mainly includes implementation and

management of commissioning of HVAC works, commissioning of electrical works,

commissioning of plumbing as well as commissioning of fire fighting works.

本工程系调试工作主要包括通风空调工程调试、电气工程调试、给排水及消防工程调

试实施及管理工作。

1. Commissioning indispensable conditions are shown in the table 3.14.1-1.

1、调试具备条件见表3.14.1-1。

1 / 26

Table 3.14.1-1 Commissioning indispensable conditions

表3.14.1-1 调试具备条件

No.

序号

Name of

system

系统名称

Preparatory work before commissioning

调试前的准备工作

Installation of electrical equipment is completed. Laying of bridge, medium

& low voltage cables and busbar is completed; wiring of secondary control

cables is right as per drawings. Installation of power and lighting

Electrical

1 system

电气系统

switchboard is completed; installation and wiring of power equipment are

completed; appearance check is qualified. Wiring of various lamps is

completed. Wiring of various switch panels is completed.

电气设备安装完毕。桥架及中、低压电缆、母线敷设完毕,二次控制电缆按

图纸接线正确。动力、照明配电盘安装完毕,动力设备安装、接线完毕,外

观检查合格。各种灯具接线完成,各种开关面板接线完毕。

Stable power supply for air conditioning ventilating equipment, duct purging

is qualified. Stable power supply for air conditioning water system, system

2

HVAC system flushing is qualified; hydraulic pressure of the system meets requirements;

通风空调系统 valve is turned on and turned off normally.

空调风系统设备供电稳定,风管吹扫合格。空调水系统设备供电稳定,系统

冲洗合格;系统水压满足要求,阀门启闭正常。

System of

plumbing as

3

well as fire

fighting

给排水及

消防系统

Connection of equipment and pipeline is correct, it shall check

completeness before equipment operates, hydraulic pressure test of pipe

system and circulating flushing work of system have been completed.

设备和管道连接准确,设备运行前应进行完整性检查,管道系统水压试验与

系统循环清洗工作已经完毕。

2. Organization measures of commissioning

2、调试的组织措施

(1)Organization chart of commissioning is shown in the figure 3.14.1-2.

(1)调试的组织机构见图3.14.1-2。

2 / 26

发布评论

评论列表 (0)

  1. 暂无评论