GTX IEC EXPANSION AUTOMATIC TRANSFER SWITCH (ATS)
SEQUENCE OF OPERATION
Table of Contents
1 General
1.1 Automatic Transfer Switches
1.2 Indicators
1.3 Control Switches
2 ATS Operation
2.1 Loss of Preferred Source
2.2 Automatic Return from Loss of Preferred Source
2.3 Alternate Source Not Available
2.4 Manual Transfer to Alternate Source
1
1
1
1
1
1
2
2
Error! Bookmark not defined.
GTX IEC ATS
2014 Nov 18
1
General
The GTX Series Automatic Transfer Switch (ATS) is the device to quickly and safely
transfer the load the circuit from normal power source to emergency power source when
normal source have issue and back to normal source after it return to well. Permitting load
to continue running with minimal or no outage during loss of utility power.
Which may offer 40A-400A current ratings, single phase & 3 phases 50&60Hz, 2 poles/3
poles/4 poles multiple options.
We offer the sales drawing, schematic drawing , O&M, Brochure etc for customer
application reference. .
1.1
Automatic Transfer Switches
Each ATS has the following power connections:
Normal – Closed (Normal Source – Primary Supply)
Emergency – Open (Emergency Source – Alternate Supply)
Load – Feeder to load being served.
1.2
Indicators
The following indicator lights will be provided on the control panel of each ATS:
S1(Utility) Available Green LED: When on, Indicates source is acceptable .
S1(Utility) Position Green LED: When on, Indicates ATS is connected to Utility.
S2(Utility) Available Green LED: When on, Indicates source is acceptable .
S2(Utility) Position Green LED: When on, Indicates ATS is connected to Generator.
Timing/In-Phase Amber LED: When blinking, Indicates the ATS is timing a Delay,
when on steady, indicates the ATS is waiting for both sources to synchronize with
each other. When off and other lights is on, indicates the ATS is in working.
1.3
Control Switches
The following control switches will be provided on the control panel of each ATS:
MX70 controller for voltage & frequency sensing and control the power panel to
transfer.
May use the TEST key, EXERCISE SET Key, BYPASS TIMER Key, CANCEL
Key to implement the test, cancel, bypass or pre scheduled repeating self test function.
Each ATS will be assembled with one Manual handle for the operators to transfer the
ATS switch between normal source and emergency source manually, all manual
operation must be operated base on without power status
All delay time setting will be used the computer to connect the controller for delay
timer setting.
2
ATS Operation
The following operations to each ATS:
2.1
Loss of Preferred Source
Upon loss of Preferred Source, the delay to engine start timer(P) begins its timing
cycle. After the P timer has completed its timing cycle, the engine start contacts close
to start the generator
When generator voltage and frequency reach the preset restore points, the Alternate
source available Led illuminates. Simultaneously, the delay to generator timer(W)
begins its timing cycle. When the W time delay is completed the ATS will transfer to
Generator, the S1 position LED goes off, and the S2 position LED illuminates.
GTX IEC ATS
2014 Nov 18
2.2
Automatic Return from Loss of Preferred Source
After power is restored to the preferred source, the delay to utility timer(T) begins its
timing cycle. When the T timer has completed its timing cycle the ATS will transfer.
The optional S2 alternative source position LED go off, and the S1 position LED
illuminates.
The delay engines stop timer(U) begins its timing cycle. The generator runs unloaded
for the duration of the U timing cycle. When the timer completes its timing cycle, the
generator will stop, The S2 available LED goes off. .
2.3
Alternate Source Not Available or if both sources fail.
If the alternate source is not available or if both sources fail. If the normal source
fails, no transfer will occur.
2.4
Manually transfer between Preferred source and Alternative source
Every ATS Power panel assembled with one manual handle for If the operator wants the
ATS to transfer to the alternate source manually, all manual operation must be operated
base on without power status.
For manually transfer, the operator just insert the manual handle to the rotary axis hole,
then may operate to the preferred source or alternative source. We may see if which have
been connected the source by the indication of the “N” or “E” indicator on the cover.
END OF SECTION
GTX IEC ATS
2014 Nov 18
2024年8月26日发(作者:郎骞泽)
GTX IEC EXPANSION AUTOMATIC TRANSFER SWITCH (ATS)
SEQUENCE OF OPERATION
Table of Contents
1 General
1.1 Automatic Transfer Switches
1.2 Indicators
1.3 Control Switches
2 ATS Operation
2.1 Loss of Preferred Source
2.2 Automatic Return from Loss of Preferred Source
2.3 Alternate Source Not Available
2.4 Manual Transfer to Alternate Source
1
1
1
1
1
1
2
2
Error! Bookmark not defined.
GTX IEC ATS
2014 Nov 18
1
General
The GTX Series Automatic Transfer Switch (ATS) is the device to quickly and safely
transfer the load the circuit from normal power source to emergency power source when
normal source have issue and back to normal source after it return to well. Permitting load
to continue running with minimal or no outage during loss of utility power.
Which may offer 40A-400A current ratings, single phase & 3 phases 50&60Hz, 2 poles/3
poles/4 poles multiple options.
We offer the sales drawing, schematic drawing , O&M, Brochure etc for customer
application reference. .
1.1
Automatic Transfer Switches
Each ATS has the following power connections:
Normal – Closed (Normal Source – Primary Supply)
Emergency – Open (Emergency Source – Alternate Supply)
Load – Feeder to load being served.
1.2
Indicators
The following indicator lights will be provided on the control panel of each ATS:
S1(Utility) Available Green LED: When on, Indicates source is acceptable .
S1(Utility) Position Green LED: When on, Indicates ATS is connected to Utility.
S2(Utility) Available Green LED: When on, Indicates source is acceptable .
S2(Utility) Position Green LED: When on, Indicates ATS is connected to Generator.
Timing/In-Phase Amber LED: When blinking, Indicates the ATS is timing a Delay,
when on steady, indicates the ATS is waiting for both sources to synchronize with
each other. When off and other lights is on, indicates the ATS is in working.
1.3
Control Switches
The following control switches will be provided on the control panel of each ATS:
MX70 controller for voltage & frequency sensing and control the power panel to
transfer.
May use the TEST key, EXERCISE SET Key, BYPASS TIMER Key, CANCEL
Key to implement the test, cancel, bypass or pre scheduled repeating self test function.
Each ATS will be assembled with one Manual handle for the operators to transfer the
ATS switch between normal source and emergency source manually, all manual
operation must be operated base on without power status
All delay time setting will be used the computer to connect the controller for delay
timer setting.
2
ATS Operation
The following operations to each ATS:
2.1
Loss of Preferred Source
Upon loss of Preferred Source, the delay to engine start timer(P) begins its timing
cycle. After the P timer has completed its timing cycle, the engine start contacts close
to start the generator
When generator voltage and frequency reach the preset restore points, the Alternate
source available Led illuminates. Simultaneously, the delay to generator timer(W)
begins its timing cycle. When the W time delay is completed the ATS will transfer to
Generator, the S1 position LED goes off, and the S2 position LED illuminates.
GTX IEC ATS
2014 Nov 18
2.2
Automatic Return from Loss of Preferred Source
After power is restored to the preferred source, the delay to utility timer(T) begins its
timing cycle. When the T timer has completed its timing cycle the ATS will transfer.
The optional S2 alternative source position LED go off, and the S1 position LED
illuminates.
The delay engines stop timer(U) begins its timing cycle. The generator runs unloaded
for the duration of the U timing cycle. When the timer completes its timing cycle, the
generator will stop, The S2 available LED goes off. .
2.3
Alternate Source Not Available or if both sources fail.
If the alternate source is not available or if both sources fail. If the normal source
fails, no transfer will occur.
2.4
Manually transfer between Preferred source and Alternative source
Every ATS Power panel assembled with one manual handle for If the operator wants the
ATS to transfer to the alternate source manually, all manual operation must be operated
base on without power status.
For manually transfer, the operator just insert the manual handle to the rotary axis hole,
then may operate to the preferred source or alternative source. We may see if which have
been connected the source by the indication of the “N” or “E” indicator on the cover.
END OF SECTION