最新消息: USBMI致力于为网友们分享Windows、安卓、IOS等主流手机系统相关的资讯以及评测、同时提供相关教程、应用、软件下载等服务。

NOV Fiber Glass Systems 秒次容器管道和两件件接头系统(红色线程、绿

IT圈 admin 28浏览 0评论

2024年10月9日发(作者:管曦)

Product Name 14/15

Product

NOV Fiber Glass Systems offers secondary containment piping systems

with two-piece fittings that meet EPA requirements and help protect

the environment by containing possible fluid leaks in case of damage

to the system. Both vinyl ester and epoxy resin systems are available to

match your application.

Secondary containment piping systems are available in 3”-16” sizes. The

primary and secondary containment piping is manufactured by either

filament winding or the centrifugal casting process. Refer to Brochure

CI1000 for more details.

The secondary containment system is designed for use with Red

Thread, Green Thread, Z-CORE™, Centricast Plus RB-2530 or CL-2030,

and Centricast RB-1520 or CL-1520 primary (product) pipe. Primary

piping can be centered in the containment piping by using centralizers

and anchors as needed.

The secondary containment piping system consists of the next larger

pipe size (as a minimum) and special two-piece fittings. The size of the

containment pipe may be dictated by the leak detection method used.

Standard fittings are manufactured with epoxy vinyl ester resin. Fittings

are manufactured by either the compression molding process, or the

contact molding process.

The specific primary, or product, piping should be selected to meet

your particular temperature, chemical, and pressure requirements.

Depending on size and type of product, the pipe can withstand pres-

sures to 450 psig and temperatures to 275˚ F. Refer to Brochure CI1000

and associated Product Data bulletins for your primary pipe selection.

The containment systems can be pressure tested and continuously

monitored.

Refer to Matched Taper Joint, Socket Joint, and Clam Shell Installation

Manuals..

Years of experience have proven that fiberglass pipe from NOV Fiber

Glass Systems will outlast pipe made of traditional materials. The

service life of fiberglass pipe is far greater than that of pipe made from

protected steel, copper, black iron, and even stainless steel.

The advantages of lightweight fiberglass piping are even greater when

installing secondary containment systems. Very little equipment is

required, and the ease of installation results in material handling and

installation cost savings.

Fittings

A complete range of primary fittings is manufactured with the same

temperature and pressure capabilities as the pipe. For containment

systems, easy to use two-piece fittings constructed of epoxy vinyl ester

resin and fiberglass are available.

***************/fgs

2

Standard Secondary Containment Piping Systems

Primary Pipe Size

in

1

2

3

4

6

8

10

12

14

(1)

(2)

Minimum Containment Pipe Size for Red

Thread & Green Thread Primary Pipe

mm

--

--

3

(1)

Minimum Containment Pipe Size for

Centricast RB & CL and Z-Core Primary Pipe

in

3

3

3

(1)

4

(1)

6

(1)

8

10

(2)

12

14

16

4

(1)

6

(1)

8

10

12

14

16

When using 2”, 3”, or 4” sweep fittings, use containment pipe and fittings that are two diameter sizes larger than the primary. Contact the factory for recommendations.

When using 8” 90º elbows, 12” containment 90º elbows may be needed. Contact factory for recommendations.

NOTE: When using 3” 90˚ elbows, 6” containment 90˚ elbow may be needed. Contact the factory for recommendations.

NOTE: Primary couplings must be installed inside of secondary containment coupling fittings.

Installation

Air Testing

Hydrostatic test should be used instead of air or compressed

gas if possible. When air or compressed gas is used for testing,

tremendous amounts of energy can be stored in the system. If a

failure occurs, the energy may be released catastrophically, which

can result in property damage and personal injury. In cases where

system contamination or fluid weight prevents the use of hydrostatic

test, air test may be used with extreme caution. To reduce the risk

of air testing, use the use the table below to determine maximum

pressure. When pressurizing the system with air or compressed

gas, the area surrounding the piping must be cleared of personnel

to prevent injury. Hold air pressure for one hour, then reduce the

pressure to one half the original. Personnel can then enter the area

to perform soap test of all joints. Again, extreme caution must

be exercised during air testing to prevent property damage or

personnel injury. If air or compressed gas testing is used, NOV Fiber

Glass Systems will not be responsible for any resulting injury to

personnel or damage to property, including the piping system. Air or

compressed gas testing is done entirely at the discretion and risk of

management at the job site.

Refer to installation manuals for instructions.

NOTE: It is highly recommended that assembly training be conducted

by a factory representative prior to installation start up.

When connecting containment pipe and fittings, plain ends of the

containment pipe are machined or thoroughly sanded to accept the

two-piece containment fitting. Containment pipe must be positioned

over the primary piping before assembly and bonding of the primary

pipe system. The size of the containment fittings may dictate the

minimum center line dimensions for the primary piping.

Upon completion of a successful primary pipe test procedure, the

two-piece secondary containment fittings may be installed. They

are installed using threaded inserts embedded in the fittings and

the hex-head bolts supplied by NOV Fiber Glass Systems. A system-

matching adhesive must be applied to all bonding surfaces just prior to

being joined by the bolts. The secondary containment system must be

given time for the adhesive to properly cure before testing the annular

space.

The testing of secondary containment piping systems is recommended

to ensure the integrity of the pipe, fittings and joints of all types. The

introduction of the test fluid during testing should be controlled to

prevent sudden pressure surges (Water Hammer). Water Hammer can

produce pressures that greatly exceed recommended system test

pressure.

WARNING: These procedures must be followed to avoid serious personal injury or

property damage. Failure to do so will result in loss of warranty. Buyer, installer or any

employee, agent or representative thereof assumes the risk of any damage or injury to

person or property.

Testing with air or gas can be extremely dangerous. Review safety precautions before

starting the test and follow all testing procedures.

Maximum Allowable Air Test Pressure

Containment Pipe Size

Pressure, psig

3"-8"

15

10"

10

12"-16"

5

3

Anchors

Anchors are available to control pipe movement due to thermal

expansion/contractions or fluid flow transients. Secondary

containment anchors bond directly to the primary pipe and to the

inside of the secondary containment fittings to eliminate relative

movement between the two piping systems. The secondary piping

can be anchored externally by the methods in Manual No. ENG1000

as required.

Custom Design

NOV Fiber Glass Systems can help you in solving secondary

containment piping design problems. NOV Fiber Glass Systems also

has experience in designing and installing double-wall secondary

containment systems 16” diameter and larger. Contact NOV Fiber

Glass Systems for additional information.

Dimensional Data for Containment Fittings

Containment

(2)

A

Size

in

3

4

6

8

10

12

14

16

(1)

(2)

B

mm

152

191

203

279

457

546

572

572

in

7

8

9

13

21½

26

27

29

mm

178

203

229

330

546

660

686

737

C

in

14

14

16

20

24

26¼

28

32

mm

356

356

406

508

610

667

711

813

D

(1)

in

--

6

8

12

15

17

29

31½

mm

--

152

279

305

381

432

737

800

E

in

11

13

15

23¼

32½

37½

43½

47½

mm

298

333

387

591

826

953

F

in

7

7

8

13

19

22½

mm

178

181

203

330

483

572

724

813

H

in

2

2

2

43/16

43/16

5

5

mm

51

51

51

64

106

106

127

127

I

in

7

8

9

14

21½

26

27

29

mm

178

203

229

356

546

660

686

737

W

in

mm

38

38

38

44

44

44

44

44

mm

80

100

150

200

250

300

350

400

in

6

8

11

18

21½

22½

22½

1,10528½

1,20732

The overall length is based on the largest size.

Sizes 3"-6” are compression molded and 8"-16” are contact molded.

View of Fitting Illustrations

45° Elbow90° Elbow

Tee

45° LateralAnchor Assembly

Coupling

Centralizers

Concentric Reducer

Termination Fitting (Vented/Non Vented)

***************/fgs

4

National Oilwell Varco has produced this brochure for general

information only, and it is not intended for design purposes. Although

every effort has been made to maintain the accuracy and reliability of

its contents, National Oilwell Varco in no way assumes responsibility

for liability for any loss, damage or injury resulting from the use of

information and data herein nor is any warranty expressed or implied.

Always cross-reference the bulletin date with the most current version

listed at the web site noted in this literature.

Fiber Glass Systems

17115 San Pedro Avenue, Ste 200

San Antonio, Texas 78232 USA

Phone: 210 477 7500

Fax: 210 477 7560

© 2016 National Oilwell Varco All rights reserved

CI1352ENG April 2016

***************/fgs

2024年10月9日发(作者:管曦)

Product Name 14/15

Product

NOV Fiber Glass Systems offers secondary containment piping systems

with two-piece fittings that meet EPA requirements and help protect

the environment by containing possible fluid leaks in case of damage

to the system. Both vinyl ester and epoxy resin systems are available to

match your application.

Secondary containment piping systems are available in 3”-16” sizes. The

primary and secondary containment piping is manufactured by either

filament winding or the centrifugal casting process. Refer to Brochure

CI1000 for more details.

The secondary containment system is designed for use with Red

Thread, Green Thread, Z-CORE™, Centricast Plus RB-2530 or CL-2030,

and Centricast RB-1520 or CL-1520 primary (product) pipe. Primary

piping can be centered in the containment piping by using centralizers

and anchors as needed.

The secondary containment piping system consists of the next larger

pipe size (as a minimum) and special two-piece fittings. The size of the

containment pipe may be dictated by the leak detection method used.

Standard fittings are manufactured with epoxy vinyl ester resin. Fittings

are manufactured by either the compression molding process, or the

contact molding process.

The specific primary, or product, piping should be selected to meet

your particular temperature, chemical, and pressure requirements.

Depending on size and type of product, the pipe can withstand pres-

sures to 450 psig and temperatures to 275˚ F. Refer to Brochure CI1000

and associated Product Data bulletins for your primary pipe selection.

The containment systems can be pressure tested and continuously

monitored.

Refer to Matched Taper Joint, Socket Joint, and Clam Shell Installation

Manuals..

Years of experience have proven that fiberglass pipe from NOV Fiber

Glass Systems will outlast pipe made of traditional materials. The

service life of fiberglass pipe is far greater than that of pipe made from

protected steel, copper, black iron, and even stainless steel.

The advantages of lightweight fiberglass piping are even greater when

installing secondary containment systems. Very little equipment is

required, and the ease of installation results in material handling and

installation cost savings.

Fittings

A complete range of primary fittings is manufactured with the same

temperature and pressure capabilities as the pipe. For containment

systems, easy to use two-piece fittings constructed of epoxy vinyl ester

resin and fiberglass are available.

***************/fgs

2

Standard Secondary Containment Piping Systems

Primary Pipe Size

in

1

2

3

4

6

8

10

12

14

(1)

(2)

Minimum Containment Pipe Size for Red

Thread & Green Thread Primary Pipe

mm

--

--

3

(1)

Minimum Containment Pipe Size for

Centricast RB & CL and Z-Core Primary Pipe

in

3

3

3

(1)

4

(1)

6

(1)

8

10

(2)

12

14

16

4

(1)

6

(1)

8

10

12

14

16

When using 2”, 3”, or 4” sweep fittings, use containment pipe and fittings that are two diameter sizes larger than the primary. Contact the factory for recommendations.

When using 8” 90º elbows, 12” containment 90º elbows may be needed. Contact factory for recommendations.

NOTE: When using 3” 90˚ elbows, 6” containment 90˚ elbow may be needed. Contact the factory for recommendations.

NOTE: Primary couplings must be installed inside of secondary containment coupling fittings.

Installation

Air Testing

Hydrostatic test should be used instead of air or compressed

gas if possible. When air or compressed gas is used for testing,

tremendous amounts of energy can be stored in the system. If a

failure occurs, the energy may be released catastrophically, which

can result in property damage and personal injury. In cases where

system contamination or fluid weight prevents the use of hydrostatic

test, air test may be used with extreme caution. To reduce the risk

of air testing, use the use the table below to determine maximum

pressure. When pressurizing the system with air or compressed

gas, the area surrounding the piping must be cleared of personnel

to prevent injury. Hold air pressure for one hour, then reduce the

pressure to one half the original. Personnel can then enter the area

to perform soap test of all joints. Again, extreme caution must

be exercised during air testing to prevent property damage or

personnel injury. If air or compressed gas testing is used, NOV Fiber

Glass Systems will not be responsible for any resulting injury to

personnel or damage to property, including the piping system. Air or

compressed gas testing is done entirely at the discretion and risk of

management at the job site.

Refer to installation manuals for instructions.

NOTE: It is highly recommended that assembly training be conducted

by a factory representative prior to installation start up.

When connecting containment pipe and fittings, plain ends of the

containment pipe are machined or thoroughly sanded to accept the

two-piece containment fitting. Containment pipe must be positioned

over the primary piping before assembly and bonding of the primary

pipe system. The size of the containment fittings may dictate the

minimum center line dimensions for the primary piping.

Upon completion of a successful primary pipe test procedure, the

two-piece secondary containment fittings may be installed. They

are installed using threaded inserts embedded in the fittings and

the hex-head bolts supplied by NOV Fiber Glass Systems. A system-

matching adhesive must be applied to all bonding surfaces just prior to

being joined by the bolts. The secondary containment system must be

given time for the adhesive to properly cure before testing the annular

space.

The testing of secondary containment piping systems is recommended

to ensure the integrity of the pipe, fittings and joints of all types. The

introduction of the test fluid during testing should be controlled to

prevent sudden pressure surges (Water Hammer). Water Hammer can

produce pressures that greatly exceed recommended system test

pressure.

WARNING: These procedures must be followed to avoid serious personal injury or

property damage. Failure to do so will result in loss of warranty. Buyer, installer or any

employee, agent or representative thereof assumes the risk of any damage or injury to

person or property.

Testing with air or gas can be extremely dangerous. Review safety precautions before

starting the test and follow all testing procedures.

Maximum Allowable Air Test Pressure

Containment Pipe Size

Pressure, psig

3"-8"

15

10"

10

12"-16"

5

3

Anchors

Anchors are available to control pipe movement due to thermal

expansion/contractions or fluid flow transients. Secondary

containment anchors bond directly to the primary pipe and to the

inside of the secondary containment fittings to eliminate relative

movement between the two piping systems. The secondary piping

can be anchored externally by the methods in Manual No. ENG1000

as required.

Custom Design

NOV Fiber Glass Systems can help you in solving secondary

containment piping design problems. NOV Fiber Glass Systems also

has experience in designing and installing double-wall secondary

containment systems 16” diameter and larger. Contact NOV Fiber

Glass Systems for additional information.

Dimensional Data for Containment Fittings

Containment

(2)

A

Size

in

3

4

6

8

10

12

14

16

(1)

(2)

B

mm

152

191

203

279

457

546

572

572

in

7

8

9

13

21½

26

27

29

mm

178

203

229

330

546

660

686

737

C

in

14

14

16

20

24

26¼

28

32

mm

356

356

406

508

610

667

711

813

D

(1)

in

--

6

8

12

15

17

29

31½

mm

--

152

279

305

381

432

737

800

E

in

11

13

15

23¼

32½

37½

43½

47½

mm

298

333

387

591

826

953

F

in

7

7

8

13

19

22½

mm

178

181

203

330

483

572

724

813

H

in

2

2

2

43/16

43/16

5

5

mm

51

51

51

64

106

106

127

127

I

in

7

8

9

14

21½

26

27

29

mm

178

203

229

356

546

660

686

737

W

in

mm

38

38

38

44

44

44

44

44

mm

80

100

150

200

250

300

350

400

in

6

8

11

18

21½

22½

22½

1,10528½

1,20732

The overall length is based on the largest size.

Sizes 3"-6” are compression molded and 8"-16” are contact molded.

View of Fitting Illustrations

45° Elbow90° Elbow

Tee

45° LateralAnchor Assembly

Coupling

Centralizers

Concentric Reducer

Termination Fitting (Vented/Non Vented)

***************/fgs

4

National Oilwell Varco has produced this brochure for general

information only, and it is not intended for design purposes. Although

every effort has been made to maintain the accuracy and reliability of

its contents, National Oilwell Varco in no way assumes responsibility

for liability for any loss, damage or injury resulting from the use of

information and data herein nor is any warranty expressed or implied.

Always cross-reference the bulletin date with the most current version

listed at the web site noted in this literature.

Fiber Glass Systems

17115 San Pedro Avenue, Ste 200

San Antonio, Texas 78232 USA

Phone: 210 477 7500

Fax: 210 477 7560

© 2016 National Oilwell Varco All rights reserved

CI1352ENG April 2016

***************/fgs

发布评论

评论列表 (0)

  1. 暂无评论