110kVGIS局放、耐压试验方案
110kV GIS ___ Scheme
The scheme proposes the n process。test wiring。methods。
safety measures。and n matters for the 110kV GIS AC withstand
test in the 110kV ___.
Project Overview:
This project is a new 110kV n project。and the 110kV part
adopts SF6 ___ (referred to as GIS)。The GIS ___ ing intervals。
three outgoing intervals。two segmented intervals。and three
busbars。using ___。Ltd。The electrical wiring uses the two-line
three-transformer n external bridging method。The GIS model is
belongs to SF6 gas-insulated metal-___.
Test Objectives:
To check whether the n performance of the GIS after overall
___ intact。and to verify whether there are us hidden dangers
(such as internal debris。poor n process。internal component
displacement ___。etc.) that may change the original design of the
electric field n and cause weak links and hidden dangers。___
during n。To ensure the safe n of the equipment。an ___.
Test Basis:
-2006 "___"
7674-1997 "Gas-Insulated Metal-___ 72.5 kV and
Above"
3.Q/FJG.2-2004 "___" of Fujian Electric Power Co。Ltd。
Article 7.1.1 stipulates that the test voltage value is 80% of the
___-to-ground voltage for 110kV are 230kV。and the on-site ___-
to-ground voltage for 110kV are 184kV.
IEC517 and GB7674 consider that the test voltage
frequency in the range of 10-300Hz is ___ to the power frequency
test.
5.___ documents from the GIS manufacturer (Xiamen ___。
Ltd.).
___:
t Manager
cal Leader
-site Manager
-site Test Leader and Data Recorder
in charge of short-circuit grounding and discharge of
the first and second loops of the tested GIS。and short-circuit of
the high-voltage part of the boosting equipment。with n
6.___。with n
-site safety officer
test technicians and several auxiliary workers
al assistance personnel: on-site n personnel。
supervisors。and owner ___.
Test ___:
Variable frequency AC series ___:
1) Variable frequency power supply (HDSR-F host 1)
2) n transformer (HDSR-F-B81X1)
3) Test reactor (HDSR-F-L32/584)
4) Divider (HDSR-F-C2501)
六、安全措施
为了确保试验过程的安全,以下是必须遵守的安全措施:
1.进入试验现场,试验人员必须戴安全帽,穿绝缘鞋。工
作负责人和现场安全员负责人应监督各项安全措施的落实。试
验现场不准吸烟,并备有足够的灭火器材。
2.所有试验现场人员应听从试验负责人的指挥。开始试验
前,负责人应对全体试验人员详细说明在试验区应注意的安全
注意事项,并做好记录。
3.试验时,试验设备及被试品周围应栏好红白带,并由专
人看护。加压及试验过程中,试验人员、___指派人员及其他
相关人员对GIS现场观察,如有异常情况,应及时向试验负
责人联系。
4.对每一个状态的耐压试验前后,均应测量绝缘电阻,作
为耐压前后的比较,应无明显差别。
5.试验前必须加设安全遮栏,并挂“止步,高压危险”标示
牌。试验时室内与户外各有专人看守,试验现场必须戴安全帽,
高空作业必须挂安全带。试验时带电体与试验人员的距离不得
小于2m。
7.试验结束以后,不要马上靠近或接近高压设备。为防止
意外发生,请确保残余电压泄放安全,且应对试验设备和被试
设备进行充分放电后(时间不应小于1分钟),才可进行拆卸
试验设备。
8.整个试验过程严格按照《电业安全工作规程》进行工作,
严格遵守第十一章“电气试验”第一节“高压试验”第228-235条
规定。由现场安全员进行监督。
9.工作中如需使用梯子等登高工具时,应有专人扶持,做
好防止高摔的安全措施。搬运梯子时应放倒,两人搬运,登高
作业应系好安全带。
10.试验仪器设备与被试设备接地必须良好可靠。
11.高压引线的接线要牢固并尽量缩短,高压引线必须使
用绝缘物支持固定。
12.试验装置的电源开关应具有明显断开点,并有可靠的
过载、过压保护装置。
13.试验设备加电前必须先检查接线,将所有仪器、设备
归零位,并通知现场人员离开高压试验区域。
14.操作时必须有监护人监视并呼唤。加压过程中,工作
人员应精神集中,监护人传达口令应清楚准确,防止异常情况
的发生。当出现异常情况时,应立即停止试验,断开电源,并
经过放电并将升压设备的高压部分短路接地后方可检查,查明
原因后才可继续试验。
15.更改接线时,首先断开试验电源,再进行放电,并将
调压设备的高压部分短路接地后方更改接线。
During non-testing ds。the high-voltage electrodes of the
high-voltage test equipment should be grounded with a grounding
rod。and the GIS should be discharged ___.
After the test is completed。the n locking device of the GIS
(___) that was temporarily removed for the test should be restored。
and the temporary secondary short-circuiting wire should be
removed。The secondary terminal n pieces of the CT should also
be restored。It is necessary to check for any otten tools。wires。
or other items on the GIS and remove the fence.
In the event of ___ winds of level six or above。the ___.
___:
GIS should be fully installed。inflated。and pass the
SF6 ___ of the GIS (circuit breaker。current transformer) should
also pass。and the n resistance of the main circuit should not be
less than 6000MΩ。The polarity should also be checked while
measuring the n resistance。The SF6 gas should be filled to the
rated density (at 20℃。the rated pressure for the arc-extinguishing
chamber is 0.5MPa。for ___ 0.4MPa。and for all other chambers
is 0.4MPa)。The on-___。Ltd。should confirm that everything is
correct before the test can proceed.
___ test。the test voltage should be applied from the
output bushing。and the voltage transformer on the GIS should be
disconnected or removed (with the manufacturer's agreement。it
___。but the test frequency needs to be greater than 150Hz to
avoid ___)。The lightning arrester on the GIS should be
disconnected。and the secondary winding of all current
transformers on the GIS should be short-circuited and grounded
before the test can proceed.
each test。Xiamen Power Engineering Company。
the supervisory party。and the GIS manufacturer should confirm
the test and the test sample。After everything is confirmed to be
correct。pressure can be applied。___ of the power industry
should also come to inspect the test project.
___ value of the on-site test is 80% of the factory test
applied voltage value (___)。and the test frequency should be een
10-300Hz。The specified test voltage should be applied een each
phase conductor and the shell。one phase at a time。and the
conductors of the other phases should be connected to the
grounded shell。The test power supply can be connected to any
part of the test phase conductor (the best test n)。The selected test
program should ensure that each component is ___ formulating the
test plan。it is necessary to pay n to ___.
the AC ___。___ be connected。and SF6 gas should
be filled to the rated pressure and left for 24 hours before passing
___ minutes at ___.
the AC ___。the contact resistance of the main circuit
should be retested.
Test method and re:
1.n method:
For the 110kV Mag Yao line GIS。the test voltage is applied
from the II n busbar at the 110kV side of the #2 main ___ and the
shell。Each phase is tested separately。and the other two phases
are short-circuited to the grounded shell.
GIS交流耐压试验记录格式
试验日期:_______ 天气:_______ 温度:_______ 湿度:
_______
试验部位及试验方式:
一、磁瑶变110kV GIS导体对外壳:
项目 接线 A/ B.C.E B/ A.C.E C/ A.B.E
绝缘电阻(MΩ) 耐压前 耐压后
电容量(nF)
谐振频率(Hz)
试验电压(kV)
加压时间(min)
二、磁瑶变110kV GIS#1主变、(M2、M3)母联断路
器断口耐压试验:
项目 接线 A.B.C/E
绝缘电阻(MΩ) 耐压前 耐压后
电容量(nF)
谐振频率(Hz)
试验电压(kV)
加压时间(min)
三、磁瑶变110kV GIS M1、M2母联断路器断口耐压试
验:
项目 接线 A.B.C/E
绝缘电阻(MΩ) 耐压前 耐压后
电容量(nF)
谐振频率(Hz)
试验电压(kV)
加压时间(min)
附表2: GIS交流耐压试验计算公式
1)、试验频率计算公式(Hz)。f=1/2π√LC
2)、一次高压电流计算公式(A)。I=2πfCU
3)、试验电源容量计算公式(kVA)。P=2πfCxU2
注:在图1基础上去掉Zm、K、M即为工频耐压试验线
路图。
九、GIS交流耐压试验判据
每个GIS部件都必须按选定的试验程序耐受规定的试验
电压下持续1分钟不发生闪络或击穿。试验前后绝缘电阻无明
显变化,方可认为整个GIS的交流耐压试验已通过。
如果在试验过程中发生击穿放电,可采取以下步骤:
1.进行重复试验,如果该设备还能经受规定的试验电压,
则认为放电是自恢复放电,耐压试验通过。
2.如果重复耐压失败,则需要将设备解体(或返厂),打
开放电间隔,仔细检查绝缘损坏情况,采取必要的修复措施,
再进行规定的耐压试验。
十、试验记录
9.1 要求试验记录应完整、清晰、准确。
9.2 试验记录格式见附表1.
附图1:GIS交流耐压试验接线原理图
L
A
C1
TV
CXAC380VB
TRC2
C
TR调频电源。T励磁变压器。L可调电抗。C1C2分压器。
CX被试GIS
ES72、隔离刀闸DS71、断路器开
关CB71.
附表3-3: 110kV GIS一次设备#3主变、M1-M2母联断路
器断口耐压试验步骤表
序号 操作顺序 操作GIS设备各个状态 监理 操作人 监护
人 复查人 业主复查人
1 拉开M1-M2母联间隔接地刀闸ES32、隔离刀闸DS31、
断路器开关CB31;合上M1-M2母联间隔接地刀闸ES31、隔
离刀闸DS32.√ √ √ √
2 拉开2号主变间隔接地刀闸ES41、ES42;合上2号主
变间隔隔离刀闸DS41.√ √ √ √
3 拉开M2-M3母联间隔接地刀闸ES51、ES52;合上M1-
M2母联隔离刀闸DS51、DS52、合上断路器开关CB51.√ √ √
√
4 拉开2号进线间隔接地刀闸ES61、隔离刀闸DS61;合
上快速接地刀闸FES61.√ √ √ √
5 拉开3号主变间隔接地刀闸ES71、断路器开关CB71;
合上接地开关ES72、隔离开关DS71.√ √ √ √
附表3-4: 复测110kV GIS一次设备整个回路导体的接触
电阻试验步骤表
序号 操作顺序 操作GIS设备各个状态 监理 操作人 监护
人 复查人 业主复查人
1 合上1号进线间隔接地刀闸ES21、隔离刀闸DS21、快
速接地刀闸FES21;拉开电压互感器隔离刀闸DS22.√ √ √ √
2 合上1号主变间隔接地刀闸ES11、ES12、隔离刀闸
DS11、合上断路器开关CB11.√ √ √ √
3 合上M1-M2母联间隔接地刀闸ES31、ES32、隔离刀闸
DS31、DS32、断路器开关CB31.√ √ √ √
4 合上2号主变间隔接地刀闸ES41、ES42;隔离刀闸
DS41.√ √ √ √
5 合上M2-M3母联间隔接地刀闸ES51、ES52、隔离刀闸
DS51、DS52、断路器开关CB51.√ √ √ √
6 合上2号进线间隔接地刀闸ES61、隔离刀闸DS61、快
速接地刀闸FES61;拉开电压互感器隔离刀闸DS62.√ √ √ √
7 合上3号主变间隔接地刀闸ES71、ES72、隔离刀闸
DS71、断路器开关CB71.√ √ √ √
删除明显有问题的段落和格式错误后,文章如下:
为了保证110kV GIS一次设备整个回路导体的接触电阻,
需要进行试验。附表3-5为110kV GIS内PT和MOA老练耐
压试验步骤表,试验接线状态如下:
1.操作GIS设备各个状态,监理、操作人监护人和厂家复
查人进行复查。
2.拉开1号进线间隔接地刀闸ES21、快速接地刀闸
FES21;合上1号进线间隔隔离刀闸DS21、电压互感器隔离
刀闸DS22、避雷器导杆已与母线连通。
3.拉开1号主变间隔接地刀闸ES11、ES12、隔离刀闸
DS11、断路器开关CB11.
4.拉开M1-M2母联间隔接地刀闸ES31、ES32;合上M1-
M2母联间隔隔离刀闸DS31、DS32、合上断路器开关CB31.
5.拉开2号主变间隔接地刀闸ES41、ES42;合上2号主
变间隔隔离刀闸DS41.
6.拉开M2-M3母联间隔接地刀闸ES51、ES52;合上M1-
M2母联间隔隔离刀闸DS51、DS52、合上断路器开关CB51.
7.拉开2号进线间隔接地刀闸ES61、快速接地刀闸
FES61;合上2号进线间隔隔离刀闸DS61、电压互感器隔离
刀闸DS62、避雷器导杆已与母线连通。
8.拉开3号主变间隔接地刀闸ES71、ES72、隔离刀闸
DS71、断路器开关CB71.
以上为试验接线状态,按照附表3-5的步骤进行试验即可。
2024年10月22日发(作者:能月华)
110kVGIS局放、耐压试验方案
110kV GIS ___ Scheme
The scheme proposes the n process。test wiring。methods。
safety measures。and n matters for the 110kV GIS AC withstand
test in the 110kV ___.
Project Overview:
This project is a new 110kV n project。and the 110kV part
adopts SF6 ___ (referred to as GIS)。The GIS ___ ing intervals。
three outgoing intervals。two segmented intervals。and three
busbars。using ___。Ltd。The electrical wiring uses the two-line
three-transformer n external bridging method。The GIS model is
belongs to SF6 gas-insulated metal-___.
Test Objectives:
To check whether the n performance of the GIS after overall
___ intact。and to verify whether there are us hidden dangers
(such as internal debris。poor n process。internal component
displacement ___。etc.) that may change the original design of the
electric field n and cause weak links and hidden dangers。___
during n。To ensure the safe n of the equipment。an ___.
Test Basis:
-2006 "___"
7674-1997 "Gas-Insulated Metal-___ 72.5 kV and
Above"
3.Q/FJG.2-2004 "___" of Fujian Electric Power Co。Ltd。
Article 7.1.1 stipulates that the test voltage value is 80% of the
___-to-ground voltage for 110kV are 230kV。and the on-site ___-
to-ground voltage for 110kV are 184kV.
IEC517 and GB7674 consider that the test voltage
frequency in the range of 10-300Hz is ___ to the power frequency
test.
5.___ documents from the GIS manufacturer (Xiamen ___。
Ltd.).
___:
t Manager
cal Leader
-site Manager
-site Test Leader and Data Recorder
in charge of short-circuit grounding and discharge of
the first and second loops of the tested GIS。and short-circuit of
the high-voltage part of the boosting equipment。with n
6.___。with n
-site safety officer
test technicians and several auxiliary workers
al assistance personnel: on-site n personnel。
supervisors。and owner ___.
Test ___:
Variable frequency AC series ___:
1) Variable frequency power supply (HDSR-F host 1)
2) n transformer (HDSR-F-B81X1)
3) Test reactor (HDSR-F-L32/584)
4) Divider (HDSR-F-C2501)
六、安全措施
为了确保试验过程的安全,以下是必须遵守的安全措施:
1.进入试验现场,试验人员必须戴安全帽,穿绝缘鞋。工
作负责人和现场安全员负责人应监督各项安全措施的落实。试
验现场不准吸烟,并备有足够的灭火器材。
2.所有试验现场人员应听从试验负责人的指挥。开始试验
前,负责人应对全体试验人员详细说明在试验区应注意的安全
注意事项,并做好记录。
3.试验时,试验设备及被试品周围应栏好红白带,并由专
人看护。加压及试验过程中,试验人员、___指派人员及其他
相关人员对GIS现场观察,如有异常情况,应及时向试验负
责人联系。
4.对每一个状态的耐压试验前后,均应测量绝缘电阻,作
为耐压前后的比较,应无明显差别。
5.试验前必须加设安全遮栏,并挂“止步,高压危险”标示
牌。试验时室内与户外各有专人看守,试验现场必须戴安全帽,
高空作业必须挂安全带。试验时带电体与试验人员的距离不得
小于2m。
7.试验结束以后,不要马上靠近或接近高压设备。为防止
意外发生,请确保残余电压泄放安全,且应对试验设备和被试
设备进行充分放电后(时间不应小于1分钟),才可进行拆卸
试验设备。
8.整个试验过程严格按照《电业安全工作规程》进行工作,
严格遵守第十一章“电气试验”第一节“高压试验”第228-235条
规定。由现场安全员进行监督。
9.工作中如需使用梯子等登高工具时,应有专人扶持,做
好防止高摔的安全措施。搬运梯子时应放倒,两人搬运,登高
作业应系好安全带。
10.试验仪器设备与被试设备接地必须良好可靠。
11.高压引线的接线要牢固并尽量缩短,高压引线必须使
用绝缘物支持固定。
12.试验装置的电源开关应具有明显断开点,并有可靠的
过载、过压保护装置。
13.试验设备加电前必须先检查接线,将所有仪器、设备
归零位,并通知现场人员离开高压试验区域。
14.操作时必须有监护人监视并呼唤。加压过程中,工作
人员应精神集中,监护人传达口令应清楚准确,防止异常情况
的发生。当出现异常情况时,应立即停止试验,断开电源,并
经过放电并将升压设备的高压部分短路接地后方可检查,查明
原因后才可继续试验。
15.更改接线时,首先断开试验电源,再进行放电,并将
调压设备的高压部分短路接地后方更改接线。
During non-testing ds。the high-voltage electrodes of the
high-voltage test equipment should be grounded with a grounding
rod。and the GIS should be discharged ___.
After the test is completed。the n locking device of the GIS
(___) that was temporarily removed for the test should be restored。
and the temporary secondary short-circuiting wire should be
removed。The secondary terminal n pieces of the CT should also
be restored。It is necessary to check for any otten tools。wires。
or other items on the GIS and remove the fence.
In the event of ___ winds of level six or above。the ___.
___:
GIS should be fully installed。inflated。and pass the
SF6 ___ of the GIS (circuit breaker。current transformer) should
also pass。and the n resistance of the main circuit should not be
less than 6000MΩ。The polarity should also be checked while
measuring the n resistance。The SF6 gas should be filled to the
rated density (at 20℃。the rated pressure for the arc-extinguishing
chamber is 0.5MPa。for ___ 0.4MPa。and for all other chambers
is 0.4MPa)。The on-___。Ltd。should confirm that everything is
correct before the test can proceed.
___ test。the test voltage should be applied from the
output bushing。and the voltage transformer on the GIS should be
disconnected or removed (with the manufacturer's agreement。it
___。but the test frequency needs to be greater than 150Hz to
avoid ___)。The lightning arrester on the GIS should be
disconnected。and the secondary winding of all current
transformers on the GIS should be short-circuited and grounded
before the test can proceed.
each test。Xiamen Power Engineering Company。
the supervisory party。and the GIS manufacturer should confirm
the test and the test sample。After everything is confirmed to be
correct。pressure can be applied。___ of the power industry
should also come to inspect the test project.
___ value of the on-site test is 80% of the factory test
applied voltage value (___)。and the test frequency should be een
10-300Hz。The specified test voltage should be applied een each
phase conductor and the shell。one phase at a time。and the
conductors of the other phases should be connected to the
grounded shell。The test power supply can be connected to any
part of the test phase conductor (the best test n)。The selected test
program should ensure that each component is ___ formulating the
test plan。it is necessary to pay n to ___.
the AC ___。___ be connected。and SF6 gas should
be filled to the rated pressure and left for 24 hours before passing
___ minutes at ___.
the AC ___。the contact resistance of the main circuit
should be retested.
Test method and re:
1.n method:
For the 110kV Mag Yao line GIS。the test voltage is applied
from the II n busbar at the 110kV side of the #2 main ___ and the
shell。Each phase is tested separately。and the other two phases
are short-circuited to the grounded shell.
GIS交流耐压试验记录格式
试验日期:_______ 天气:_______ 温度:_______ 湿度:
_______
试验部位及试验方式:
一、磁瑶变110kV GIS导体对外壳:
项目 接线 A/ B.C.E B/ A.C.E C/ A.B.E
绝缘电阻(MΩ) 耐压前 耐压后
电容量(nF)
谐振频率(Hz)
试验电压(kV)
加压时间(min)
二、磁瑶变110kV GIS#1主变、(M2、M3)母联断路
器断口耐压试验:
项目 接线 A.B.C/E
绝缘电阻(MΩ) 耐压前 耐压后
电容量(nF)
谐振频率(Hz)
试验电压(kV)
加压时间(min)
三、磁瑶变110kV GIS M1、M2母联断路器断口耐压试
验:
项目 接线 A.B.C/E
绝缘电阻(MΩ) 耐压前 耐压后
电容量(nF)
谐振频率(Hz)
试验电压(kV)
加压时间(min)
附表2: GIS交流耐压试验计算公式
1)、试验频率计算公式(Hz)。f=1/2π√LC
2)、一次高压电流计算公式(A)。I=2πfCU
3)、试验电源容量计算公式(kVA)。P=2πfCxU2
注:在图1基础上去掉Zm、K、M即为工频耐压试验线
路图。
九、GIS交流耐压试验判据
每个GIS部件都必须按选定的试验程序耐受规定的试验
电压下持续1分钟不发生闪络或击穿。试验前后绝缘电阻无明
显变化,方可认为整个GIS的交流耐压试验已通过。
如果在试验过程中发生击穿放电,可采取以下步骤:
1.进行重复试验,如果该设备还能经受规定的试验电压,
则认为放电是自恢复放电,耐压试验通过。
2.如果重复耐压失败,则需要将设备解体(或返厂),打
开放电间隔,仔细检查绝缘损坏情况,采取必要的修复措施,
再进行规定的耐压试验。
十、试验记录
9.1 要求试验记录应完整、清晰、准确。
9.2 试验记录格式见附表1.
附图1:GIS交流耐压试验接线原理图
L
A
C1
TV
CXAC380VB
TRC2
C
TR调频电源。T励磁变压器。L可调电抗。C1C2分压器。
CX被试GIS
ES72、隔离刀闸DS71、断路器开
关CB71.
附表3-3: 110kV GIS一次设备#3主变、M1-M2母联断路
器断口耐压试验步骤表
序号 操作顺序 操作GIS设备各个状态 监理 操作人 监护
人 复查人 业主复查人
1 拉开M1-M2母联间隔接地刀闸ES32、隔离刀闸DS31、
断路器开关CB31;合上M1-M2母联间隔接地刀闸ES31、隔
离刀闸DS32.√ √ √ √
2 拉开2号主变间隔接地刀闸ES41、ES42;合上2号主
变间隔隔离刀闸DS41.√ √ √ √
3 拉开M2-M3母联间隔接地刀闸ES51、ES52;合上M1-
M2母联隔离刀闸DS51、DS52、合上断路器开关CB51.√ √ √
√
4 拉开2号进线间隔接地刀闸ES61、隔离刀闸DS61;合
上快速接地刀闸FES61.√ √ √ √
5 拉开3号主变间隔接地刀闸ES71、断路器开关CB71;
合上接地开关ES72、隔离开关DS71.√ √ √ √
附表3-4: 复测110kV GIS一次设备整个回路导体的接触
电阻试验步骤表
序号 操作顺序 操作GIS设备各个状态 监理 操作人 监护
人 复查人 业主复查人
1 合上1号进线间隔接地刀闸ES21、隔离刀闸DS21、快
速接地刀闸FES21;拉开电压互感器隔离刀闸DS22.√ √ √ √
2 合上1号主变间隔接地刀闸ES11、ES12、隔离刀闸
DS11、合上断路器开关CB11.√ √ √ √
3 合上M1-M2母联间隔接地刀闸ES31、ES32、隔离刀闸
DS31、DS32、断路器开关CB31.√ √ √ √
4 合上2号主变间隔接地刀闸ES41、ES42;隔离刀闸
DS41.√ √ √ √
5 合上M2-M3母联间隔接地刀闸ES51、ES52、隔离刀闸
DS51、DS52、断路器开关CB51.√ √ √ √
6 合上2号进线间隔接地刀闸ES61、隔离刀闸DS61、快
速接地刀闸FES61;拉开电压互感器隔离刀闸DS62.√ √ √ √
7 合上3号主变间隔接地刀闸ES71、ES72、隔离刀闸
DS71、断路器开关CB71.√ √ √ √
删除明显有问题的段落和格式错误后,文章如下:
为了保证110kV GIS一次设备整个回路导体的接触电阻,
需要进行试验。附表3-5为110kV GIS内PT和MOA老练耐
压试验步骤表,试验接线状态如下:
1.操作GIS设备各个状态,监理、操作人监护人和厂家复
查人进行复查。
2.拉开1号进线间隔接地刀闸ES21、快速接地刀闸
FES21;合上1号进线间隔隔离刀闸DS21、电压互感器隔离
刀闸DS22、避雷器导杆已与母线连通。
3.拉开1号主变间隔接地刀闸ES11、ES12、隔离刀闸
DS11、断路器开关CB11.
4.拉开M1-M2母联间隔接地刀闸ES31、ES32;合上M1-
M2母联间隔隔离刀闸DS31、DS32、合上断路器开关CB31.
5.拉开2号主变间隔接地刀闸ES41、ES42;合上2号主
变间隔隔离刀闸DS41.
6.拉开M2-M3母联间隔接地刀闸ES51、ES52;合上M1-
M2母联间隔隔离刀闸DS51、DS52、合上断路器开关CB51.
7.拉开2号进线间隔接地刀闸ES61、快速接地刀闸
FES61;合上2号进线间隔隔离刀闸DS61、电压互感器隔离
刀闸DS62、避雷器导杆已与母线连通。
8.拉开3号主变间隔接地刀闸ES71、ES72、隔离刀闸
DS71、断路器开关CB71.
以上为试验接线状态,按照附表3-5的步骤进行试验即可。