最新消息: USBMI致力于为网友们分享Windows、安卓、IOS等主流手机系统相关的资讯以及评测、同时提供相关教程、应用、软件下载等服务。

SmartPVMS V500R007C00 南澳洲远程逆变器关机指南说明书

IT圈 admin 21浏览 0评论

2024年10月25日发(作者:郝诗柳)

SmrtPVMS

V500R007C00

Operation Guide for Remote

Inverter Shutdown in South

Australia

Issue

Date

01

2020-12-18

HUAWEI TECHNOLOGIES CO., LTD.

Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.

No part of this document may be reproduced or transmitted in any form or by any means without prior

written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

Notice

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

All other trademarks and trade names mentioned in this document are the property of their respective

holders.

The purchased products, services and features are stipulated by the contract made between Huawei and

the customer. All or part of the products, services and features described in this document may not be

within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,

information, and recommendations in this document are provided "AS IS" without warranties, guarantees

or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the

preparation of this document to ensure accuracy of the contents, but all statements, information, and

recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.

Address:Huawei Industrial Base

Bantian, Longgang

Shenzhen 518129

People's Republic of China

Website:

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.i

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South AustraliaContents

Contents

1 About 1

2 Remote Shutdown Process 2

3 Differences in the Commissioning for 3

4 Operation Guide .5

4.1 Downloading .5

4.2 Obtaining .5

4.3 7

4.4 Setting 9

4.5 10

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co.,

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia1 About This Document

1

About This Document

This document applies to the scenario where national metering identifiers (NMIs)

are used to authorize Australian power grid agents to remotely shut down

inverters in batches. This document is intended for power grid agents and

installers.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.1

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia2 Remote Shutdown Process in Australia

2

Remote Shutdown Process in Australia

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.2

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia

3 Differences in the Commissioning for Australian

Users

3

Background

Differences in the Commissioning for

Australian Users

The new "Remote Disconnect and Reconnection of electricity generating plants"

technical standard, published by the Government of South Australia and in effect

as of 28 September 2020, requires that all new prescribed electricity generating

plants be capable of being remotely disconnected, and later reconnected, by

relevant agents. Please refer to the following instructions to complete the setting

for all plants that need to meet this standard.

Table 3-1 Differences in the commissioning

No

.

1

Differe

nce

Login

domai

n

name

South

Australia

Region

so

.c

om

Other

countries

or regions

so

.c

om

Affe

cted

User

Agen

ts,

instal

lers,

and

owne

rs in

Sout

h

Austr

alia

Insta

llers

in

Sout

h

Austr

alia

Remarks

-

2Plant

NMI

setting

The NMI

needs to be

set.

The NMI

does not

need to be

set.

According to the

requirements of the

Government of South

Australia, an NMI must be

set for a new plant to

ensure that relevant agents

can remotely shut down

inverters.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.3

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia

3 Differences in the Commissioning for Australian

Users

No

.

3

Differe

nce

Alarm

subscri

ption

setting

South

Australia

Region

Alarm

subscription

needs to be

set.

Other

countries

or regions

Alarm

subscription

does not

need to be

set.

Affe

cted

User

Insta

llers

in

Sout

h

Austr

alia

Remarks

According to the

requirements of the

Government of South

Australia, alarm

subscription must be set for

new plants to ensure that

users can monitor the

disconnection between

devices and the FusionSolar

Smart PV Management

System.

-4App

downlo

ad

Download

the app

through the

QR code or

link by

referring to

4.1

Downloadin

g the App.

FusionSolar

App Quick

Guide

.

Download

the app by

referring to

Insta

llers

and

owne

rs in

Sout

h

Austr

alia

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.4

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

4

Operation Guide for Installers

This section describes how installers can obtain accounts, perform deployment

commissioning, add plants, and set NMI information.

4.1 Downloading the App

Table 4-1 Methods for downloading the FusionSolar app

Method 1: Scan the QR Code to

Download the App.

Method 2: Click the Link to Download

the App.

/

fusionsolarapp

4.2 Obtaining an Account

Obtaining an Account by Self-Registration

●Registration in the WebUI: If you access the FusionSolar portal using the

domain name , click Installer

Registration and register an account as prompted.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.5

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

●Registration in the app:

the domain name to .

NO TE

The domain name must be . Otherwise, the remote

shutdown function cannot be used.

No account? to register an installer account.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.6

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia

NO TE

4 Operation Guide for Installers

If your company has been registered, you can contact the upper-level installer to allocate

an account.

Obtaining an Account Allocated by the Upper-Level Installer

Contact the upper-level installer to allocate an account. After obtaining the

account, you can log in to the FusionSolar portal using the domain name

.

4.3 Deployment Commissioning

After a device is installed, you need to log in to the FusionSolar app to

commission the device and set management system parameters. For details, see

FusionSolar App Quick Guide

.

If you use the FusionSolar app for the first time, set the domain name to

.

NO TE

You must set the domain name of the FusionSolar portal to .

Otherwise, the remote shutdown function cannot be used.

When commissioning the SmartLogger, set Server to

on the Management System.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.7

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

When commissioning the inverter, set Domain name to

on the Connect to mgmt sys.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.8

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

4.4 Setting the NMI

According to the requirements of the Government of South Australia, an NMI

must be set for a new plant to ensure that relevant agents can remotely shut

down inverters.

Procedure

●Method 1: Set the NMI in the FusionSolar app.

●Method 2: Set the NMI in the FusionSolar portal.

Plants > Plant > Plant Management from the main menu.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.9

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

the Plant Management page, click

the plant list.

in the Operation column of

the Set Basic Info tab page, set Remote startup/shutdown

authorization code (NMI).

Save.

4.5 Alarm Subscription

According to the requirements of the Government of South Australia, alarm

subscription must be set for new plants to ensure that users can monitor the

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.10

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

disconnection between devices and the FusionSolar Smart PV Management

System.

Prerequisite

The email server of the company has been configured. For details, Search

Configuring an Email Server

in the FusionSolar portal.

Prerequisites

●The alarm push rules take effect only for newly reported alarms. If an alarm

has been reported to the Management system before the push rules take

effect, no notification email will be sent.

When a new alarm that meets the push rules is reported to the Management

system, the push rules are triggered immediately to send an email to the

specified users.

If the time zone of the recipient is different from that of the server, the alarm

generation time in the email is displayed based on the time zone of the

server.

By default, the rules are sorted by the enabled and disabled states, and the

rules in the same state are sorted by update time in descending order.

A maximum of 1000 remote notification rules can be created.

Procedure

System > Business Configuration > Alarm Configuration from the

main menu.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.11

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

the navigation pane on the left, click Push Settings.

the Push Settings page, click Add.

the Add Rule dialog box, set the rule parameters.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.12

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

NO TE

To send notifications to relevant personnel, you need to enter their personal

information, such as email addresses. You are obligated to take considerable measures,

in compliance with the laws of the countries concerned and the user privacy policies of

your company, to ensure that users' personal data is fully protected.

Save.

Related Tasks

Deleting a rule: You can select a redundant rule from the rule list and click

Delete to reduce the rule maintenance workload.

Enabling/disabling a rule: You can select a rule that is not used temporarily

from the rule list and click Disable. To use a disabled rule, select the rule and

click Enable.

Backing up, collecting statistics on, and reviewing rules, and modifying rules

in batches: You can click Export on the rule page to export rules and back up,

review, and collect statistics on the rules. If you need to modify rules in

batches, you can modify the rules in batches in the exported rule file. Then,

click Import on the rule page to import the modified rule file.

NO TE

When the notification rules are exported, the email addresses of the recipient users

are exported. You are obligated to take considerable measures, in compliance with the

laws of the countries concerned and the user privacy policies of your company, to

ensure that the user's personal information is fully protected.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.13

2024年10月25日发(作者:郝诗柳)

SmrtPVMS

V500R007C00

Operation Guide for Remote

Inverter Shutdown in South

Australia

Issue

Date

01

2020-12-18

HUAWEI TECHNOLOGIES CO., LTD.

Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.

No part of this document may be reproduced or transmitted in any form or by any means without prior

written consent of Huawei Technologies Co., Ltd.

Trademarks and Permissions

Notice

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.

All other trademarks and trade names mentioned in this document are the property of their respective

holders.

The purchased products, services and features are stipulated by the contract made between Huawei and

the customer. All or part of the products, services and features described in this document may not be

within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements,

information, and recommendations in this document are provided "AS IS" without warranties, guarantees

or representations of any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in the

preparation of this document to ensure accuracy of the contents, but all statements, information, and

recommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.

Address:Huawei Industrial Base

Bantian, Longgang

Shenzhen 518129

People's Republic of China

Website:

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.i

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South AustraliaContents

Contents

1 About 1

2 Remote Shutdown Process 2

3 Differences in the Commissioning for 3

4 Operation Guide .5

4.1 Downloading .5

4.2 Obtaining .5

4.3 7

4.4 Setting 9

4.5 10

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co.,

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia1 About This Document

1

About This Document

This document applies to the scenario where national metering identifiers (NMIs)

are used to authorize Australian power grid agents to remotely shut down

inverters in batches. This document is intended for power grid agents and

installers.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.1

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia2 Remote Shutdown Process in Australia

2

Remote Shutdown Process in Australia

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.2

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia

3 Differences in the Commissioning for Australian

Users

3

Background

Differences in the Commissioning for

Australian Users

The new "Remote Disconnect and Reconnection of electricity generating plants"

technical standard, published by the Government of South Australia and in effect

as of 28 September 2020, requires that all new prescribed electricity generating

plants be capable of being remotely disconnected, and later reconnected, by

relevant agents. Please refer to the following instructions to complete the setting

for all plants that need to meet this standard.

Table 3-1 Differences in the commissioning

No

.

1

Differe

nce

Login

domai

n

name

South

Australia

Region

so

.c

om

Other

countries

or regions

so

.c

om

Affe

cted

User

Agen

ts,

instal

lers,

and

owne

rs in

Sout

h

Austr

alia

Insta

llers

in

Sout

h

Austr

alia

Remarks

-

2Plant

NMI

setting

The NMI

needs to be

set.

The NMI

does not

need to be

set.

According to the

requirements of the

Government of South

Australia, an NMI must be

set for a new plant to

ensure that relevant agents

can remotely shut down

inverters.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.3

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia

3 Differences in the Commissioning for Australian

Users

No

.

3

Differe

nce

Alarm

subscri

ption

setting

South

Australia

Region

Alarm

subscription

needs to be

set.

Other

countries

or regions

Alarm

subscription

does not

need to be

set.

Affe

cted

User

Insta

llers

in

Sout

h

Austr

alia

Remarks

According to the

requirements of the

Government of South

Australia, alarm

subscription must be set for

new plants to ensure that

users can monitor the

disconnection between

devices and the FusionSolar

Smart PV Management

System.

-4App

downlo

ad

Download

the app

through the

QR code or

link by

referring to

4.1

Downloadin

g the App.

FusionSolar

App Quick

Guide

.

Download

the app by

referring to

Insta

llers

and

owne

rs in

Sout

h

Austr

alia

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.4

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

4

Operation Guide for Installers

This section describes how installers can obtain accounts, perform deployment

commissioning, add plants, and set NMI information.

4.1 Downloading the App

Table 4-1 Methods for downloading the FusionSolar app

Method 1: Scan the QR Code to

Download the App.

Method 2: Click the Link to Download

the App.

/

fusionsolarapp

4.2 Obtaining an Account

Obtaining an Account by Self-Registration

●Registration in the WebUI: If you access the FusionSolar portal using the

domain name , click Installer

Registration and register an account as prompted.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.5

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

●Registration in the app:

the domain name to .

NO TE

The domain name must be . Otherwise, the remote

shutdown function cannot be used.

No account? to register an installer account.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.6

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia

NO TE

4 Operation Guide for Installers

If your company has been registered, you can contact the upper-level installer to allocate

an account.

Obtaining an Account Allocated by the Upper-Level Installer

Contact the upper-level installer to allocate an account. After obtaining the

account, you can log in to the FusionSolar portal using the domain name

.

4.3 Deployment Commissioning

After a device is installed, you need to log in to the FusionSolar app to

commission the device and set management system parameters. For details, see

FusionSolar App Quick Guide

.

If you use the FusionSolar app for the first time, set the domain name to

.

NO TE

You must set the domain name of the FusionSolar portal to .

Otherwise, the remote shutdown function cannot be used.

When commissioning the SmartLogger, set Server to

on the Management System.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.7

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

When commissioning the inverter, set Domain name to

on the Connect to mgmt sys.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.8

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

4.4 Setting the NMI

According to the requirements of the Government of South Australia, an NMI

must be set for a new plant to ensure that relevant agents can remotely shut

down inverters.

Procedure

●Method 1: Set the NMI in the FusionSolar app.

●Method 2: Set the NMI in the FusionSolar portal.

Plants > Plant > Plant Management from the main menu.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.9

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

the Plant Management page, click

the plant list.

in the Operation column of

the Set Basic Info tab page, set Remote startup/shutdown

authorization code (NMI).

Save.

4.5 Alarm Subscription

According to the requirements of the Government of South Australia, alarm

subscription must be set for new plants to ensure that users can monitor the

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.10

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

disconnection between devices and the FusionSolar Smart PV Management

System.

Prerequisite

The email server of the company has been configured. For details, Search

Configuring an Email Server

in the FusionSolar portal.

Prerequisites

●The alarm push rules take effect only for newly reported alarms. If an alarm

has been reported to the Management system before the push rules take

effect, no notification email will be sent.

When a new alarm that meets the push rules is reported to the Management

system, the push rules are triggered immediately to send an email to the

specified users.

If the time zone of the recipient is different from that of the server, the alarm

generation time in the email is displayed based on the time zone of the

server.

By default, the rules are sorted by the enabled and disabled states, and the

rules in the same state are sorted by update time in descending order.

A maximum of 1000 remote notification rules can be created.

Procedure

System > Business Configuration > Alarm Configuration from the

main menu.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.11

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

the navigation pane on the left, click Push Settings.

the Push Settings page, click Add.

the Add Rule dialog box, set the rule parameters.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.12

SmrtPVMS

Operation Guide for Remote Inverter Shutdown in

South Australia4 Operation Guide for Installers

NO TE

To send notifications to relevant personnel, you need to enter their personal

information, such as email addresses. You are obligated to take considerable measures,

in compliance with the laws of the countries concerned and the user privacy policies of

your company, to ensure that users' personal data is fully protected.

Save.

Related Tasks

Deleting a rule: You can select a redundant rule from the rule list and click

Delete to reduce the rule maintenance workload.

Enabling/disabling a rule: You can select a rule that is not used temporarily

from the rule list and click Disable. To use a disabled rule, select the rule and

click Enable.

Backing up, collecting statistics on, and reviewing rules, and modifying rules

in batches: You can click Export on the rule page to export rules and back up,

review, and collect statistics on the rules. If you need to modify rules in

batches, you can modify the rules in batches in the exported rule file. Then,

click Import on the rule page to import the modified rule file.

NO TE

When the notification rules are exported, the email addresses of the recipient users

are exported. You are obligated to take considerable measures, in compliance with the

laws of the countries concerned and the user privacy policies of your company, to

ensure that the user's personal information is fully protected.

Issue 01 (2020-12-18)Copyright © Huawei Technologies Co., Ltd.13