UNPACKING
02
RACK-MOUNT INSTALLATION
(CONT’D)
Unpacking the NVIDIA Quadro Plex Rack-mount Kit
1
Slide the bracket assembly out of the rack side panel.
2
Adjust the rack side panel to fit the rack. Loosen eight (8) screws
to adjust the length of the side-panel.
One rack-mount kit has all the hardware necessary to install one
NVIDIA Quadro Plex 7000 in a standard 19-inch Electronics Industries
Alliance (EIA) cabinet. Note that the NVIDIA Quadro Plex 7000 takes
up half the width space in a rack which allows two Quadro Plex’s to be
rack-mounted side-by-side.
8x
One (1) Side Rail, Eight (8)
Screws
Used to mount the NVIDIA Quadro
Plex 7000 in a standard 19” EIA
rack.
4x
One (1) Rear Alignment Bracket,
Four (4) Screws
Connects two Quadro Plex 7000
units when mounting side by side
in a rack.
Two (2) Thumb Screws
Used to secure the NVIDIA
Quadro Plex 7000 to the rack
and side rail.
3
Install the side panel into the cabinet.
02
Use the following procedure to install the NVIDIA Quadro Plex
7000 into a standard 19-inch EIA equipment cabinet. You will need
a Phillips #2 screw driver to install the rack mount kit hardware.
The NVIDIA Quadro Plex 7000 must be mounted within 2 meters of
the host system.
Rack-mount Installation
Refer to the NVIDIA Quadro Plex 7000 Quick Start Guide for
instructions on preparing the host system and installing the
interface card.
Connecting to a Host System
RACK-MOUNT INSTALLATION
Note: The hardware in the rack-mount kit is intended for a
standard 19” EIA rack only.
Rev A
176-0119-000 Rev A
RACK MOUNT INSTRUCTIONS
QUADRO PLEX 7000
NVIDIA
®
02
4
Remove the two (2) screws holding the aluminum shells to the
Quadro Plex 7000 chassis.
9
Push the silver aluminum shell towards the display connectors
until it stops. Slide up and remove the silver aluminum shell. You
may need to slide the silver shell forward slightly to release the
retaining clips before you can lift up.
13
Secure the Quadro Plex 7000 to the rack and side panel using
the two (2) thumb screws provided in the kit.
Quadro Plex 7000 bezel.
14
If needed, remove and rotate the NVIDIA logo on the front
Note: If you are installing one Quadro Plex 7000 into the rack,
go to Step 19. If you are installing a second Quadro Plex 7000
into the rack next to the first Quadro Plex 7000, you need to
continue with Step 5.
15
Prepare the second Quadro Plex 7000 following Steps 1
through 14.
16
On each Quadro Plex 7000, remove the two screws that you
removed in Step 4.
5
Remove screw from the bottom of the Quadro Plex 7000 Chassis
10
Reinstall the two screws removed in Step 4.
11
Place the front handle bracket on top of the Quadro Plex 7000 and
attach with the eight (8) screws provided in the box.
17
Install the Alignment bracket and attach with the four (4)
screws included in the box.
6
Place the Quadro Plex 7000 silver side down.
7
Push the black aluminum shell towards the display connectors
18
Connect the power cord to the Quadro Plex 7000.
19
Connect the Interconnect Cable to the Quadro Plex 7000 and
the Workstation.
until it stops. Slide up and remove the black shell. You may need to
slide the black shell forward slightly to release the retaining clips
before you can lift up.
12
Slide the Quadro Plex 7000 into the side bracket installed in the
cabinet in Step 3. Be sure to line up the alignment bracket on the
Quadro Plex 7000 to the alignment pins on the side panel.
20
If using the Dual Host Interface Card in the workstation,
connect the G-Sync board in each Quadro Plex 7000 with a
G-Sync cable.
DVI connectors.
21
Connect DVI cables from the display(s) to the Quadro Plex 7000
Refer to the NVIDIA Quadro Plex 7000 Quick Start Guide for instructions
on installing the drivers in a Windows or Linux environment.
Note: On the Quadro Plex 7000, the primary boot monitor
is defined by your motherboard and SBIOS. To help you
determine which GPU will drive the primary boot display,
there is an orange LED between the DVI connectors which
will illuminate on the primary GPU.
8
Rotate the Quadro Plex 7000 over so the silver side is up.
2024年7月20日发(作者:朋水卉)
UNPACKING
02
RACK-MOUNT INSTALLATION
(CONT’D)
Unpacking the NVIDIA Quadro Plex Rack-mount Kit
1
Slide the bracket assembly out of the rack side panel.
2
Adjust the rack side panel to fit the rack. Loosen eight (8) screws
to adjust the length of the side-panel.
One rack-mount kit has all the hardware necessary to install one
NVIDIA Quadro Plex 7000 in a standard 19-inch Electronics Industries
Alliance (EIA) cabinet. Note that the NVIDIA Quadro Plex 7000 takes
up half the width space in a rack which allows two Quadro Plex’s to be
rack-mounted side-by-side.
8x
One (1) Side Rail, Eight (8)
Screws
Used to mount the NVIDIA Quadro
Plex 7000 in a standard 19” EIA
rack.
4x
One (1) Rear Alignment Bracket,
Four (4) Screws
Connects two Quadro Plex 7000
units when mounting side by side
in a rack.
Two (2) Thumb Screws
Used to secure the NVIDIA
Quadro Plex 7000 to the rack
and side rail.
3
Install the side panel into the cabinet.
02
Use the following procedure to install the NVIDIA Quadro Plex
7000 into a standard 19-inch EIA equipment cabinet. You will need
a Phillips #2 screw driver to install the rack mount kit hardware.
The NVIDIA Quadro Plex 7000 must be mounted within 2 meters of
the host system.
Rack-mount Installation
Refer to the NVIDIA Quadro Plex 7000 Quick Start Guide for
instructions on preparing the host system and installing the
interface card.
Connecting to a Host System
RACK-MOUNT INSTALLATION
Note: The hardware in the rack-mount kit is intended for a
standard 19” EIA rack only.
Rev A
176-0119-000 Rev A
RACK MOUNT INSTRUCTIONS
QUADRO PLEX 7000
NVIDIA
®
02
4
Remove the two (2) screws holding the aluminum shells to the
Quadro Plex 7000 chassis.
9
Push the silver aluminum shell towards the display connectors
until it stops. Slide up and remove the silver aluminum shell. You
may need to slide the silver shell forward slightly to release the
retaining clips before you can lift up.
13
Secure the Quadro Plex 7000 to the rack and side panel using
the two (2) thumb screws provided in the kit.
Quadro Plex 7000 bezel.
14
If needed, remove and rotate the NVIDIA logo on the front
Note: If you are installing one Quadro Plex 7000 into the rack,
go to Step 19. If you are installing a second Quadro Plex 7000
into the rack next to the first Quadro Plex 7000, you need to
continue with Step 5.
15
Prepare the second Quadro Plex 7000 following Steps 1
through 14.
16
On each Quadro Plex 7000, remove the two screws that you
removed in Step 4.
5
Remove screw from the bottom of the Quadro Plex 7000 Chassis
10
Reinstall the two screws removed in Step 4.
11
Place the front handle bracket on top of the Quadro Plex 7000 and
attach with the eight (8) screws provided in the box.
17
Install the Alignment bracket and attach with the four (4)
screws included in the box.
6
Place the Quadro Plex 7000 silver side down.
7
Push the black aluminum shell towards the display connectors
18
Connect the power cord to the Quadro Plex 7000.
19
Connect the Interconnect Cable to the Quadro Plex 7000 and
the Workstation.
until it stops. Slide up and remove the black shell. You may need to
slide the black shell forward slightly to release the retaining clips
before you can lift up.
12
Slide the Quadro Plex 7000 into the side bracket installed in the
cabinet in Step 3. Be sure to line up the alignment bracket on the
Quadro Plex 7000 to the alignment pins on the side panel.
20
If using the Dual Host Interface Card in the workstation,
connect the G-Sync board in each Quadro Plex 7000 with a
G-Sync cable.
DVI connectors.
21
Connect DVI cables from the display(s) to the Quadro Plex 7000
Refer to the NVIDIA Quadro Plex 7000 Quick Start Guide for instructions
on installing the drivers in a Windows or Linux environment.
Note: On the Quadro Plex 7000, the primary boot monitor
is defined by your motherboard and SBIOS. To help you
determine which GPU will drive the primary boot display,
there is an orange LED between the DVI connectors which
will illuminate on the primary GPU.
8
Rotate the Quadro Plex 7000 over so the silver side is up.