2024年5月12日发(作者:门嘉树)
11
Installation
Emergency Assist Alarm - CFEAPULLKIT
Kit Contents
This kit comprises of everything required for the complete instalation of a BS8300 Compliant
Emergency Assistance Alarm, (excluding cables and fixings).
PART CODE - CFEAODI
PART CODE - CFEAPSU
PART CODE - CFEARSP
PART CODE - CFEAPULL
Mains Wiring
The general requirement for the mains supply to the call controller is fixed wiring, using three core cable
2
of not less than 1mm . This should be fed from an isolating switched fused spur, fused at 3A, which is
marked appropriately and secure from unauthorised operation.
Extra Low Voltage (ELV) Wiring
Always segregate low voltage wiring from the mains wiring.
System requires minimum 2 core 0.4mm
2
cable.
All wall-mounting devices should be mounted onto a back box of the required depth.
Wiring Guide Using 2 Core Cable
PSU 12V supply Over Door Indicator
Over Door Indicator Cancel Unit
Cancel UnitPull Cord Unit
Power
Supply
Pull Cord Unit
+
-
-
12V
+
-
+
IN
-
+
OUT
Over Door
Indicator
-
IN
+
-
+
OUT
Cancel
Unit
Incorrect wiring may cause damage to the circuit, which will void the warranty.
2PR211-180-521-03 (25-15112-A) September 2018
Emergency Assist Alarm - CFEAPULLKIT
Installation
The Emergency Assist Alarm should be installed in accordance with the recommendations of BS8300
and to the requirements of Building Regulations Approved Document M.
The below diagram demonstrates a typical layout for installation in a disabled person toilet.
Note: Where pertinent other or alternative standards of design and installation should be adhered to.
Knot the cord to ensure the lowest
ring is 100mm from the floor.
Cut off excess cord.
Ceiling Pull is surface mounted.
The Ceiling Pull should be
positioned so that its
readily assessable from
the WC, bath
(where applicable)
The Power Supply
is sited in corridor
and supplied via
switched fuse spur
The Over Door Indicator
provides an audibly and
visually signal to
indicate the area where
assistance is required.
Screw the
two piece connctor
together
100mm
The Cancel Button
should be positioned so
that it is reachable from
the WC and a wheelchair.
The upper cord pull should be located between
800mm & 1000mm above floor level.
The lower cord pull should be exactly 100mm above floor
level (remove excess cord)
All system components are designed to be sited internally and positioned in locations where they are
readily accessible by the user. The area should be clean and dry and sound and light levels allow the
status of all device indicators and sounders to be seen and heard.
Any likelihood of tampering or vandalism should also be taken into account at time of design.
Operation
Power Supply Unit power LED is lit.
Operate the Pull Cord. LED’s will illuminate on, Pull Cord Unit, Cancel Unit and
Over Door Indicator. An internal buzzer will also sound in the Over Door Indicator.
Press the Cancel Button.
Maintenance
Clean plates with a non abrasive cleaning cloth and detergent, do not use harsh
or solvent based cleaners.
Test Call system by making and resetting a call.
PR211-180-521-03 (25-15112-A) September 2018
3
Eaton Electrical Systems Ltd.
Wheatley Hall Road, Doncaster, South
Yorkshire, DN2 4NB, United Kingdom
Eaton
EMEA Headquarters
Route de la Longeraie 7
1110 Morges, Switzerland
7
TEL: +44(0)1302 321541
FAX: +44(0)1302 30220
*****************************
*************************
2018 Eaton
All Rights Reserved
Sep 2018
Eaton is a registered trademark.
All other trademarks are property
of their respective owners.
©
2024年5月12日发(作者:门嘉树)
11
Installation
Emergency Assist Alarm - CFEAPULLKIT
Kit Contents
This kit comprises of everything required for the complete instalation of a BS8300 Compliant
Emergency Assistance Alarm, (excluding cables and fixings).
PART CODE - CFEAODI
PART CODE - CFEAPSU
PART CODE - CFEARSP
PART CODE - CFEAPULL
Mains Wiring
The general requirement for the mains supply to the call controller is fixed wiring, using three core cable
2
of not less than 1mm . This should be fed from an isolating switched fused spur, fused at 3A, which is
marked appropriately and secure from unauthorised operation.
Extra Low Voltage (ELV) Wiring
Always segregate low voltage wiring from the mains wiring.
System requires minimum 2 core 0.4mm
2
cable.
All wall-mounting devices should be mounted onto a back box of the required depth.
Wiring Guide Using 2 Core Cable
PSU 12V supply Over Door Indicator
Over Door Indicator Cancel Unit
Cancel UnitPull Cord Unit
Power
Supply
Pull Cord Unit
+
-
-
12V
+
-
+
IN
-
+
OUT
Over Door
Indicator
-
IN
+
-
+
OUT
Cancel
Unit
Incorrect wiring may cause damage to the circuit, which will void the warranty.
2PR211-180-521-03 (25-15112-A) September 2018
Emergency Assist Alarm - CFEAPULLKIT
Installation
The Emergency Assist Alarm should be installed in accordance with the recommendations of BS8300
and to the requirements of Building Regulations Approved Document M.
The below diagram demonstrates a typical layout for installation in a disabled person toilet.
Note: Where pertinent other or alternative standards of design and installation should be adhered to.
Knot the cord to ensure the lowest
ring is 100mm from the floor.
Cut off excess cord.
Ceiling Pull is surface mounted.
The Ceiling Pull should be
positioned so that its
readily assessable from
the WC, bath
(where applicable)
The Power Supply
is sited in corridor
and supplied via
switched fuse spur
The Over Door Indicator
provides an audibly and
visually signal to
indicate the area where
assistance is required.
Screw the
two piece connctor
together
100mm
The Cancel Button
should be positioned so
that it is reachable from
the WC and a wheelchair.
The upper cord pull should be located between
800mm & 1000mm above floor level.
The lower cord pull should be exactly 100mm above floor
level (remove excess cord)
All system components are designed to be sited internally and positioned in locations where they are
readily accessible by the user. The area should be clean and dry and sound and light levels allow the
status of all device indicators and sounders to be seen and heard.
Any likelihood of tampering or vandalism should also be taken into account at time of design.
Operation
Power Supply Unit power LED is lit.
Operate the Pull Cord. LED’s will illuminate on, Pull Cord Unit, Cancel Unit and
Over Door Indicator. An internal buzzer will also sound in the Over Door Indicator.
Press the Cancel Button.
Maintenance
Clean plates with a non abrasive cleaning cloth and detergent, do not use harsh
or solvent based cleaners.
Test Call system by making and resetting a call.
PR211-180-521-03 (25-15112-A) September 2018
3
Eaton Electrical Systems Ltd.
Wheatley Hall Road, Doncaster, South
Yorkshire, DN2 4NB, United Kingdom
Eaton
EMEA Headquarters
Route de la Longeraie 7
1110 Morges, Switzerland
7
TEL: +44(0)1302 321541
FAX: +44(0)1302 30220
*****************************
*************************
2018 Eaton
All Rights Reserved
Sep 2018
Eaton is a registered trademark.
All other trademarks are property
of their respective owners.
©