交工技术文件起重机械安装工程用表
Handover Technical Documentation — Lifting Machinery Installation
序号
S/N
H.1
H.2
H.3
H.4
H.5
H.6
H.7
H.8
H.9
名 称
Description
起重机轨道与车挡安装检验记录
Crane Rail and Bumper Installation Inspection Record
手动单梁起重机安装检验记录
Hand Operated Single Beam Crane Installation Inspection Record
手动双梁起重机安装检验记录
Hand Operated Double Beam Crane Installation Inspection Record
手动单梁悬挂起重机安装检验记录
Hand Operated Single Beam Suspending Crane Installation
Inspection Record
电动单梁起重机安装检验记录
Electric Single Beam Crane Installation Inspection Record
电动葫芦双梁起重机安装检验记录
Electric Hoist Double Beam Crane Installation Inspection Record
电动单梁悬挂起重机安装检验记录
Electric Single Beam Suspending Crane Installation Inspection
Record
通用桥式起重机安装检验记录
General Purpose Overhead Crane Installation Inspection Record
双梁通用门式起重机和装卸桥安装检验记录
Double Girder General Purpose Gantry Crane and Transporter
Crane Installation Inspection Record
单主梁门式起重机和装卸桥安装检验记录
Single Girder Gantry Crane and Transporter Crane Installation
Inspection Record
臂上起重机和柱式悬臂起重机安装检验记录
Jib Crane and Pillar Jib Crane Installation Inspection Record
起重机械负荷试验条件确认表
Lifting Machinery Load Test Condition Confirmation Form
起重机械空负荷试验记录
Lifting Machinery Empty load Test Record
起重机械负荷试验记录
Lifting Machinery Load Test Record
编 号
No.
SH/T 3503-J801
SH/T 3503-J802
SH/T 3503-J803
SH/T 3503-J804
SH/T 3503-J805
SH/T 3503-J806
SH/T 3503-J807
SH/T 3503-J808
SH/T 3503-J809
页次
Page No.
415
416
417
418
419
420
421
422
423
H.10
H.11
H.12
H.13
H.14
SH/T 3503-J810
SH/T 3503-J811
SH/T 3503-J812
SH/T 3503-J813
SH/T 3503-J814
424
425
426
427
428
414
SH/T 3503—2017
工程名称:
起重机轨道与车挡安装检验记录
Project Name:
Crane Rail and Bumper
单位工程名称:
Installation Inspection Record
Unit Name:
SH/T 3503—J801
Description
Specification & Model
Manufacturer
Control Mode
Rail Type
Item No.
Lifting Capacity t Span m
Working Duty Lifting Height m
Power Supply Working Environment
Rail Length m Erection Position
Allowable Value Actual Value
Actually Measured Item Conclusion
mm mm
Positional Deviation of Actual Rail Centerline Relative to Actual
Crane Beam Centerline
Rail Span Deviation
Rail Top Longitudinal
Inclination
Every 2m
Full Length
Elevation Deviation of Rail Top Datum Point
Relative Elevation Difference btw. Two Parallel Rails in the Same Section
Bending of Rail in Horizontal Plane along Length Direction
Height Difference
Rail Joints
Lateral Misalignment
Clearance
Gap at Expansion Joints
Rail Lateral Inclination Deviation
Inspection
Inspection Item Installation Requirement
Result
Joint Position of Joints shall be staggered at a distance larger than the wheel base of the
Two Parallel Rails crane.
Welded Joints of Electrodes shall meet the relevant requirements. Top and side welds of
Rail joints shall be ground to a uniform and smooth finish.
Backing Plate at The width of the backing plate (along the rail length direction) shall be
Joints of Rail twice of that at other parts.
Grouting for Concrete
Grouting shall meet the design requirements.
Crane Beam
Elastic Pad under
The specification and material of the pad shall meet the design requirements.
Prior to tightening of bolts, the rail shall be in close contact with the elastic
Rail
pad.
Rail on Steel Crane The rail shall be in close contact with the top of the crane beam. In case of
Beam any gaps, shim plates shall be installed as specified and properly welded.
Connecting Bolt
Bumper
Conclusion:
Owner/Supervision Contractor
Discipline Engineer:
Date:
Date:
General Contractor
Discipline Engineer:
Construction Contractor
Foreman:
Quality Inspector:
Discipline Engineer:
Date:
415
Connecting bolts shall be free from damaged thread or loosening.
Bumpers on two rails in the same span end shall be in contact with the
buffer of the crane.
2024年5月27日发(作者:塔梦易)
SH/T 3503—2017
附录H
Appendix H
(规范性附录)
(Normative Appendix)
交工技术文件起重机械安装工程用表
Handover Technical Documentation — Lifting Machinery Installation
序号
S/N
H.1
H.2
H.3
H.4
H.5
H.6
H.7
H.8
H.9
名 称
Description
起重机轨道与车挡安装检验记录
Crane Rail and Bumper Installation Inspection Record
手动单梁起重机安装检验记录
Hand Operated Single Beam Crane Installation Inspection Record
手动双梁起重机安装检验记录
Hand Operated Double Beam Crane Installation Inspection Record
手动单梁悬挂起重机安装检验记录
Hand Operated Single Beam Suspending Crane Installation
Inspection Record
电动单梁起重机安装检验记录
Electric Single Beam Crane Installation Inspection Record
电动葫芦双梁起重机安装检验记录
Electric Hoist Double Beam Crane Installation Inspection Record
电动单梁悬挂起重机安装检验记录
Electric Single Beam Suspending Crane Installation Inspection
Record
通用桥式起重机安装检验记录
General Purpose Overhead Crane Installation Inspection Record
双梁通用门式起重机和装卸桥安装检验记录
Double Girder General Purpose Gantry Crane and Transporter
Crane Installation Inspection Record
单主梁门式起重机和装卸桥安装检验记录
Single Girder Gantry Crane and Transporter Crane Installation
Inspection Record
臂上起重机和柱式悬臂起重机安装检验记录
Jib Crane and Pillar Jib Crane Installation Inspection Record
起重机械负荷试验条件确认表
Lifting Machinery Load Test Condition Confirmation Form
起重机械空负荷试验记录
Lifting Machinery Empty load Test Record
起重机械负荷试验记录
Lifting Machinery Load Test Record
编 号
No.
SH/T 3503-J801
SH/T 3503-J802
SH/T 3503-J803
SH/T 3503-J804
SH/T 3503-J805
SH/T 3503-J806
SH/T 3503-J807
SH/T 3503-J808
SH/T 3503-J809
页次
Page No.
415
416
417
418
419
420
421
422
423
H.10
H.11
H.12
H.13
H.14
SH/T 3503-J810
SH/T 3503-J811
SH/T 3503-J812
SH/T 3503-J813
SH/T 3503-J814
424
425
426
427
428
414
SH/T 3503—2017
工程名称:
起重机轨道与车挡安装检验记录
Project Name:
Crane Rail and Bumper
单位工程名称:
Installation Inspection Record
Unit Name:
SH/T 3503—J801
Description
Specification & Model
Manufacturer
Control Mode
Rail Type
Item No.
Lifting Capacity t Span m
Working Duty Lifting Height m
Power Supply Working Environment
Rail Length m Erection Position
Allowable Value Actual Value
Actually Measured Item Conclusion
mm mm
Positional Deviation of Actual Rail Centerline Relative to Actual
Crane Beam Centerline
Rail Span Deviation
Rail Top Longitudinal
Inclination
Every 2m
Full Length
Elevation Deviation of Rail Top Datum Point
Relative Elevation Difference btw. Two Parallel Rails in the Same Section
Bending of Rail in Horizontal Plane along Length Direction
Height Difference
Rail Joints
Lateral Misalignment
Clearance
Gap at Expansion Joints
Rail Lateral Inclination Deviation
Inspection
Inspection Item Installation Requirement
Result
Joint Position of Joints shall be staggered at a distance larger than the wheel base of the
Two Parallel Rails crane.
Welded Joints of Electrodes shall meet the relevant requirements. Top and side welds of
Rail joints shall be ground to a uniform and smooth finish.
Backing Plate at The width of the backing plate (along the rail length direction) shall be
Joints of Rail twice of that at other parts.
Grouting for Concrete
Grouting shall meet the design requirements.
Crane Beam
Elastic Pad under
The specification and material of the pad shall meet the design requirements.
Prior to tightening of bolts, the rail shall be in close contact with the elastic
Rail
pad.
Rail on Steel Crane The rail shall be in close contact with the top of the crane beam. In case of
Beam any gaps, shim plates shall be installed as specified and properly welded.
Connecting Bolt
Bumper
Conclusion:
Owner/Supervision Contractor
Discipline Engineer:
Date:
Date:
General Contractor
Discipline Engineer:
Construction Contractor
Foreman:
Quality Inspector:
Discipline Engineer:
Date:
415
Connecting bolts shall be free from damaged thread or loosening.
Bumpers on two rails in the same span end shall be in contact with the
buffer of the crane.